Proven for Real-World Performance

Quality & Functionality Testing

At Afkar, our in-house laboratory performs more than 100 tests and quality checks across product development and manufacturing, from initial tool trials and raw components to assembly, batch inspection, and finished-product validation.
Our testing procedures are designed to verify not only how a product performs today, but how reliably it will continue to perform throughout its intended service life.
Learn more

Quality Built Into Every Stage

Afkar's laboratory works directly alongside our Mold Design, Plastic Injection, Assembly, and Product Development departments.

This integrated structure allows quality findings to move quickly back into production. When a deviation is identified, our technical teams can trace its source, evaluate the relevant component or process, and implement corrective measures before products proceed to final approval. Our quality controls extend across four key stages:
Incoming Materials
Tool & Component Validation
Finished Product Testing
Production & Assembly Control
This creates a continuous quality loop rather than relying solely on final inspection.
Afkar icon stroke yellowAfkar icon stroke grey

Meet Featured Quality Tests for Ensured Functionality

Meet some  of the most important tests that are carried out by Afkar quality department to ensure and validate products functionality: 

Seal (Torque) Test

Checks twisting of turning function to determine compatibility, failure, or break.

Leak (Vaccum) Test

Tests the pump against leaks during environmental pressure change.

Pump Fatigue Test

Measures the consistency of pressing performance and dosage change up to 2000 presses.

Spring Rust Test

A machine exposes the pump to different external conditions in an accelerated way, wherein 1 day in the machine = 15 days in the real world.

Liquid Ph Test

measures the Ph and minerals of the liquid to chose the compatible materials of pump pieces.

Model Name: Quality Testing